SOP on Making Entries in inward/outward Register

👤 Written by: Naresh Bhakar
GMP & Pharmaceutical Manufacturing Expert

✓ Reviewed by: Naresh Bhakar
Reviewed for pharmaceutical accuracy

📅 Last Updated: November 19, 2026

The inward/outward register records each batch’s containers or lots moving into the quarantine/holding area (inward entry) and out for further processing (outward entry). Each entry carries the product, batch number, container or lot number with date, total count (inward) and the checking officer’s signature.

1.0 Objective

The SOP on making entries in inward/outward register is used in the production area and gives traceability of batch containers. This SOP is a procedure that lays down how entries are made in the inward/outward register.

An inward/outward register is a controlled record of the movement of batch material into and out of the quarantine/holding area.

Workflow diagram for an SOP on making entries in inward/outward register, from material handling to logbook entry and filing
The flow shows material movement, the handwritten register entry, then record checking, filing and storage.

2.0 Scope

This procedure applies to making entries in the inward/outward register in the production area. The register is a GMP record under the revised Schedule M, which India notified on 28 December 2023 and which covers documentation, records and computerised systems.

3.0 Responsibility

This section names who makes, reviews and checks the entries.

  • Officer / Executive, Production: makes the entries and signs as the checker.
  • Manager, Production: reviews the register and ensures that entries are made.
  • Quality Assurance (QA): reviews the register where the site SOP requires it.

4.0 Accountability

The Production Manager is accountable for the correct use of the register in the production area. QA is accountable for issuing the controlled register and for the review the site SOP assigns to it.

READ ALSO

Entry and Exit Procedure for staff, visitors in Pharmaceuticals

In pharmaceutical manufacturing, following entry and exit procedures for staff and visitors is essential…

5.0 Procedure

The procedure covers the inward and outward entries, the way entries are written and corrected, the action on a mismatch, and the review of the register.

5.1 Inward and outward entries

5.1.1 The production officer shall make an inward entry when the material of a particular batch is transferred from the previous stage to the quarantine/holding area.

5.1.2 The production officer shall make an outward entry when the material is taken for further processing from the quarantine/holding area.

5.1.3 The following entries must be made at the time of inward:

i. Name of product.

ii. Batch number.

Iii. Container number or lot number, with date.

iv. Total number of containers or lots.

V. Signature and date of the production or packing officer who checked the material.

5.1.4 The following entries must be made at the time of outward:

I. Container number or lot number, with date.

Ii. Signature and date of the production or packing officer who checked the material.

5.1.5 The inward and outward entries shall be made in the format given in Annexure-I. The format has space for container or lot numbers 1 to 20 for each row, both inward and outward, and the date is written against each container or lot moved in or out of the area.

5.1.6 Transfers between stages are governed by the SOP on Movement of Material from One Stage to Another, which requires the entries to be made in this register. In one site’s version of that SOP the example quarantine hold limits are 7 days for granules, 14 days for uncoated tablets and 21 days for coated tablets, and these are site values, not an industry limit. The material in the holding area must carry its status label.

5.2 Writing entries

5.2.1 The production officer shall make each entry at the time of the movement, in indelible ink, and the entry must be legible.

5.2.2 The entry shall be signed and dated by the checker, and the time must be written in the 24-hour format.

5.2.3 Back-dated and advance entries must not be made. The writing rules of the SOP on Good Documentation Practices apply to every entry, and the same 24-hour format is used in the SOP on Procedure for Making Entries in Equipment Usage Log Book.

5.2.4 Any space left unused in a row shall be marked NA and signed.

5.3 Correcting entries

5.3.1 To correct a wrong entry, the officer shall strike it through with a single line so that the original stays legible, then write the correct entry and sign and date it. A reason shall be written where needed.

5.3.2 Overwriting and correction fluid must not be used.

5.3.3 If an entry was missed at the time of the transfer, the late entry must carry a documented explanation as required by the SOP on Good Documentation Practices.

5.4 Mismatch between the register and the containers

5.4.1 If the number of containers or the container or lot numbers on the floor do not match the register, the production officer shall stop the transfer and inform the Production Manager and QA.

5.4.2 A deviation shall be raised as per the site’s deviation SOP, and the material must not be moved until the mismatch is resolved.

5.5 Review and register control

5.5.1 The Production Manager shall review the register, and QA shall review it as the site SOP says.

5.5.2 QA shall issue a controlled register with numbered pages. A paper register is acceptable when it is controlled and kept to ALCOA.

5.5.3 If an electronic system or barcode scanning replaces the paper register, the system must be validated (installation, operational and performance qualification) and must have unique user logins and an audit trail that shows the user, the time, the old and new value and the reason for the change.

5.5.4 The revision of Chapter 4 (Documentation) of EU GMP, which covers paper, electronic and hybrid records, is a draft revision published for public consultation in July 2025. The consultation closed on 7 October 2025, and the January 2011 Chapter 4 remains the version in force.

5.6 Sample register row

The values below are illustrative only and show how one row is filled.

ProductBatch No.Inward container/lot Nos. with dateTotal containers/lotsChecked by (inward)Outward container/lot Nos. with dateChecked by (outward)
Product ABXXX1 to 5, DD/MM/YYYY5Sign and date1 to 5, DD/MM/YYYYSign and date

6.0 Precautions

These precautions keep the register contemporaneous and free of back-filled records.

  • Entries must not be made from memory later in the shift.
  • No space may be left blank without NA and a signature.
  • Pencil must not be used, and an entry must never be overwritten.
  • Material must not be moved to the next stage without its outward entry.

7.0 Abbreviations

The following abbreviations are used in this SOP.

  • SOP: Standard Operating Procedure
  • GMP: Good Manufacturing Practice
  • Good Documentation Practice (GDP): Good Documentation Practices
  • ALCOA: attributable, legible, contemporaneous, original, accurate
  • QA: Quality Assurance
  • Installation Qualification (IQ) / Operational Qualification (OQ) / Performance Qualification (PQ): installation, operational and performance qualification
  • NA: Not Applicable
  • CFR: Code of Federal Regulations
  • FDA: United States Food and Drug Administration
TitleSOP No.Revision No.Effective DateReview DateSupersedesDepartmentPage
SOP on Making Entries in Inward/Outward RegisterPRD/XXX00DD/MM/YYYYDD/MM/YYYYNilProduction1 of X

Related SOP: Entry exit Procedure in Pharma SOP

8.0 Annexures

Annexure-I is the blank inward/outward register format, with the department and month/year in the header and space for container or lot numbers 1 to 20 for each row.

Product nameBatch No.Container/Lot No. (inward)Total containers/lotsChecked byContainer/Lot No. (outward)Checked by

Note: Put the date for each container or lot moved in or out of the area.

 ANNEXURE for Making Entries in inward/outward Register

9.0 Revision History

This table records each revision of the SOP and the reason for it.

Revision No.Revision DateDetails of RevisionReason for Revision
00DD/MM/YYYYNew SOPNew SOP
01DD/MM/YYYYAdded entry-writing, correction, mismatch, review and register control rules, precautions and a sample rowAlignment with data-integrity expectations

Frequently Asked Questions

What is the purpose of an inward/outward register?

The register gives a traceable record of which batch containers entered and left a production holding area, when this happened and who checked them.

When is an inward entry made and when an outward entry?

An inward entry is made when the material of a batch moves from the previous stage to the quarantine/holding area. An outward entry is made when the material is taken from that area for further processing. Both are made at the time of the movement.

How should a wrong entry be corrected?

The wrong entry is struck through with a single line so that the original stays legible. The correct entry is then written, signed and dated, with a reason where needed. Overwriting and correction fluid must never be used.

Can entries be made after the transfer is finished?

No, entries are made at the time of the movement. If an entry was missed, the late entry needs a documented explanation under the site’s Good Documentation Practices SOP, and back-dated entries are not allowed.

Is a paper register still acceptable?

Yes, when it is controlled and kept to ALCOA. An electronic system that replaces it must be validated and have unique logins and an audit trail of who changed what and why.

References

  • 21 CFR 211.188
  • Inward/Outward Register format (Annexure I) and Movement of Material SOP (in house), site documents

Leave a Comment